January 16, 2018 12:18 pm
Published by UEGCL
The installation of Hydro mechanical (turbines) and Electrical mechanical (transformers) equipment is expected to boost the progress of the 600MW... View Article
January 5, 2018 12:23 pm
Published by UEGCL
On Wednesday, 6th December, 2017, the Board of Directors led by the Board Chairperson, Eng. Proscovia Margaret NJUKI visited the... View Article
January 1, 2018 12:31 pm
Published by UEGCL
The 183(MW) Isimba Hydropower project is located along the River Nile. At Isimba, the river splits into two branches; the... View Article
December 11, 2017 1:05 pm
Published by UEGCL
The first turbine unit at the Isimba 183 (MW) hydropower project has been lowered in its position. Another milestone in... View Article
November 21, 2017 1:10 pm
Published by UEGCL
The Isimba Hydropower project is located north along the River Nile. At Isimba, the river splits into two branches which... View Article
November 20, 2017 1:25 pm
Published by UEGCL
It was on October 4, 2016, when the Parliamentary committee on Natural Resources last visited the 183MW Isimba hydro power project.... View Article
October 29, 2017 2:45 pm
Published by UEGCL
On the 4th March 2017, UEGCL signed an MoU with Makerere University College of Engineering, Design, Arts and Technology (CEDAT),... View Article
October 18, 2017 3:05 pm
Published by UEGCL
It’s interesting how brands remain relevant even after their demise. But in UEB – no need to spell it out... View Article
October 16, 2017 2:50 pm
Published by UEGCL
Dr. Stephen Robert Isabalija handed over to Eng. Proscovia Margaret Njuki, the Chairperson ship of UEGCL. The handover took place... View Article
October 14, 2017 3:09 pm
Published by UEGCL
A team of engineers are to be hired to examine the cracks on the 183MW Isimba hydropower dam as the... View Article