Uganda Electricity Generation Company Ltd
  • About
    • Company Overview
    • Our Objectives
    • Message from the CEO
    • Board Of Directors
    • Management Team
    • Heads of Units
    • Organogram
  • Our Business
    • UEGCL Services
      • Professional Services Unit
      • Research & Innovation
      • Institutional Development and Reengineering
      • Project Management and Implementation
      • Capacity Building and Training
      • Operation and Maintenance of Hydro Power Systems
      • Monitoring and Evaluation
      • Project Feasibility and Design studies
    • UEGCL Projects
      • Muzizi Hydropower Project
    • Power Stations
      • Karuma Hydropower Station
      • Kiira Power Station
      • Nalubaale Power Station
      • Isimba Hydropower Station
      • Namanve Thermal Power Station
      • Nyagak III Hydro Power Project
  • Corporate Affairs
    • Latest News
    • Press Releases
    • UEGCL in Press
      • UEGCL in Press 2025
      • UEGCL in Press 2024
      • UEGCL in Press 2023
      • UEGCL in Press 2022
      • UEGCL in Press 2021
      • UEGCL in Press 2020
      • UEGCL in Press 2018
      • UEGCL in Press 2017
    • UEGCL Photo Gallery
    • UEGCL Video Tube
  • Resources
    • GENews
    • Annual Reports
    • Acts & Policies
    • Maps of Power Plants and Dams
    • Grants & MoU’s
    • Strategic Plan and Directions
    • Quality Policy Statement
    • Integrated Management System
  • Opportunities
    • Careers Portal
    • Available Jobs
    • Bids & Tenders
  • Contact

Nyagak III Hydro Power Project

UEGCL Powerplants, Projects and Professional Services

Home  »   Nyagak III Hydro Power Project

Nyagak III Hydro Power Project

General Narrative

The 6.6 MW Nyagak III Small Hydropower Project (SHPP) is located on the Nyagak River in Zombo District, North-western Uganda, approximately 15 km from Paidha Town Council in Alindi village, Amei Parish, Paidha Sub County. The project is developed and implemented through a private-public partnership (PPP), which originated the constitution of a Special Purpose Vehicle (SPV) called GENMAX Nyagak Ltd (GENMAX) formed between the public partner; UEGCL (30% share of the PPP and SPV); and Private partner: Hydromax Ltd, together with Dott Services Ltd (70% share of the PPP and SPV).

GENMAX Nyagak Limited is in charge of the design, construction and operation of the plant for a period of 20 years after which the plant shall be transferred back to UEGCL.

The Scheme consists of a 7m high Dam located at coordinates 275804.773 N and 274736.530 E, diverting water through trash racks into a 1.318km long pipe conduit of diameter 1.72m which terminates in a Surge tank structure. The water from the Surge tank will enter a 370m long penstock with a diameter of 1.6m and be connected to a surface powerhouse. The penstock bifurcates into two 1.13m diameter pipes of 30m length leading to two horizontal Francis turbines of 3.3MW each. After passing through the Turbines, water is released back into the river through a tailrace channel. The Power generated will be evacuated to the new Nebbi Substation Switchyard via a transmission overhead 33kv line.


Key Facts

LOCATION:Zombo
OFF TAKER:UETCL
POWER:6.6 MW
PROJECT COST:19.39 USD Million
O&M:GENMAX Nyagak Ltd
EPC:DOTT Services Ltd 
COMMERCIAL OPERATION DATE:1st August 2025

Further Options

About UEGCL

Press Releases

FAQs


UEGCL Publications

folder-icon
UEGCL Annual Reports
folder-icon
GE Newsletters
folder-icon
Strategic Plans & Directions
folder-icon
UEGCL Acts & Policies
folder-icon
Other Publications

Contact Us

Uganda Electricity Generation Company Ltd.

Block C Plot 6-9 Okot Close Bukoto Victoria Office,

P.O.Box 75831, Kampala, Uganda

Telephone: +256 312 372165

E-mail: info@uegcl.go.ug

2025 © Copyright Uganda Electricity Generation Company Ltd, All rights reserved.